Lessons

TOPIC 27 · CONCISE WORKBOOK

CER, DER, VPPs and demand flexibility

Evaluate orchestration, participation and consumer value.

Understand · 1 of 4Self-paced

Aggregate customer flexibility realistically

A VPP combines devices but must respect customer consent, connection limits, state of charge and participation. Installed capacity exceeds firm dispatchable capability whenever some devices opt out or are unavailable. Rebound can move rather than remove demand.

Read · work through an example · try it yourselfWatch the video
Working relationship

Expected available MW = devices × kW each × participation ÷ 1,000

What to keep separate

Do not sell customer flexibility twice across incompatible network and market commitments.

Your task

Design a customer dispatch event including notification, opt-out, minimum reserve, compensation and rebound.

Watch the explanation

Key terms in plain English
VPP
Virtual power plant: coordinated operation of distributed resources such as batteries and flexible loads. Aggregation does not remove each device's operating or connection limits.
MW
Megawatt: a measure of power, or how quickly energy is transferred. A plant's maximum MW is not its actual output in every interval.
Dispatch
The operational process of determining output and consumption targets, subject to offers, demand and system constraints. A target is not a meter reading.
Supporting diagrams

The customer can also supply flexibility

Net grid import depends on what happens behind the meter at the same time.

  1. 01 · Site consumption10 kW

    Appliances and equipment

  2. 02 · Rooftop generation6 kW

    Used on site in this example

  3. 03 · Grid import4 kW

    10 − 6; battery idle

Synthetic instantaneous balance. With export, storage charging or discharging, add the corresponding flows and respect connection limits. A VPP coordinates resources; it does not remove the physical limits.