Transmission, distribution, REZs and regulated investment

Compare network need, options, access, benefits and cost allocation.

Understand · 1 of 4Self-paced

Compare network and non-network options

A network need should be defined by location, timing and service requirement. Reinforcement, storage and demand response can sometimes provide alternatives but are not automatically equivalent. Regulatory investment tests require their applicable scope and methodology.

Read · work through an example · try it yourselfWatch the video
Working relationship

Option comparison = service capability + timing + lifecycle cost + risk

What to keep separate

Do not present a private project NPV as the result of a regulatory investment test.

Your task

Build an options table for a local capacity constraint including a non-network alternative and failure scenario.

Watch the explanation

Key terms in plain English
Voltage
Electrical potential difference: the driving condition for current in a circuit. Voltage level is not itself a quantity of energy.