1. Wholesale unit conversion
Convert A$74/MWh to cents/kWh. This does not turn a wholesale average into a retail tariff.
Course map
Turn facts into a useful recommendation.
Four numerical checks, twelve judgement questions and one concise briefing. Use the dated source register; the exercises are open-book and self-paced.
Enter numbers only, without commas or unit symbols. These are simplified calculations from dated teaching inputs, not investment or operational models.
Convert A$74/MWh to cents/kWh. This does not turn a wholesale average into a retail tariff.
Convert the 2035–36 NEM Step Change data-centre forecast of 34 TWh into average MW using an assumed 8,760-hour year. Round to the nearest MW.
Using Hornsdale's published 150 MW / 193.5 MWh ratings, calculate ideal full-rated-power duration. Ignore losses and operating reserves for this screen.
Use the approximate figures from Snowy Hydro’s Scheme webpage (accessed 18 October 2026): 4,100 MW and 4,500 GWh average annual generation. Estimate an equivalent capacity factor for an 8,760-hour year.
Choose one answer per question. Feedback appears after submission. This practice score is not a qualification or a verified competency assessment.
Prepare a 300–500 word note for the manager of a proposed NSW data centre. Do not invent a connection offer, tariff or financing approval. No project-specific commercial inputs have been supplied.
Have a colleague or competent practitioner review the memo. This platform does not automatically grade professional judgement.
Temporary working text: not saved or sent to our server. Export before leaving or refreshing. Do not enter confidential information. 0 / 8,000 characters.
A sound brief challenges the leap from national exports to a site's price and reliability. It requests a network connection assessment, a load profile, a delivered-supply proposal and a resilience design. It distinguishes a forecast load increase from a committed connection.
A weak brief simply repeats national numbers or treats a planning scenario as a revenue guarantee. Strengthen it by naming an alternative, a missing input and the evidence that would change your recommendation.
Apply the same reasoning to import limits, PPA exposure and backup duration.