Unpack a PPA
A PPA needs a price definition, volume shape, settlement reference, term, attribute ownership and risk allocation. Pay-as-produced and firm-volume contracts transfer different risks. LGCs, ACCUs and REGO certificates have different legal meanings and eligible uses.
The lesson
6 chaptersBrowse the chapters
01Three ledgers behind a renewable purchase
A company wants predictable electricity costs and credible renewable procurement. Treat this as three connected questions: how physical electricity reaches the site, how cash settles under the contracts, and who owns the environmental attributes. A single phrase such as ‘100% renewable PPA’ does not answer all three.
A financial PPA can settle against a reference price without replacing the buyer's retail supply arrangement. A sleeved or retailer-integrated structure connects the project arrangement to retail supply in a different way. Names vary, so draw the parties and payment directions from the actual term sheet. BRC-A's linked 2019 explanation is a historical mechanism guide, not a current fee schedule or contract template.
Your first work product is a three-column ledger: physical delivery and connection; invoices and settlement; certificate ownership and claim evidence. List the retailer, generator, buyer and any intermediary separately. Then ask which party is responsible if the project is delayed or produces less than expected.
02Specify the volume before comparing the price
Pay-as-produced means the settlement quantity follows the output defined by the contract; it does not promise the buyer a fixed quantity in every hour. A firm or shaped product defines a different delivery or settlement profile and allocates balancing obligations differently. Read the definitions of eligible output, losses, outages and curtailment before treating two quoted strike prices as comparable.
For this original exercise, three one-hour periods have customer load of 40, 40 and 40 MWh and eligible project output of 60, 30 and 0 MWh. The project supplies a 90 MWh contractual settlement quantity against 120 MWh of customer demand. The signed residuals are −20, +10 and +40 MWh. Negative residual means the contract quantity exceeds load in that period; it is not ‘negative consumption’.
The net volume gap is 30 MWh, but that aggregate hides a daytime surplus and a much larger final-period shortfall. A project with more total MWh is not necessarily a better hedge for an evening-heavy customer. Compare load and eligible output on the same interval clock and with the same price reference.
03Reconcile the buyer's cash flow
Use spot prices of −$20, $60 and $200/MWh and a $70/MWh strike. Assume a financial pay-as-produced PPA where the buyer receives spot and pays fixed on 60, 30 and 0 MWh. The separate physical purchase costs −$800 + $2,400 + $8,000 = $9,600 in this deliberately simplified spot-indexed supply example.
The PPA's net receipts to the buyer are −$5,400, −$300 and $0, totalling −$5,700. A negative receipt is a payment. Net energy cost is therefore $9,600 − (−$5,700) = $15,300 before retail, network, certificate, tax and other charges. The effective energy-only cost is $127.50 per customer MWh, not the $70 strike.
Cross-check using the contract quantity at strike plus the signed residual at spot: 90 × $70 + (−20 × −$20) + (10 × $60) + (40 × $200) = $15,300. The negative-price period illustrates why an excess contract quantity can be costly. Actual clauses may change eligibility or settlement at negative prices; never assume this teaching rule appears in every PPA.
04Separate renewable electricity attributes from carbon units
An LGC is associated with one MWh of eligible renewable generation under the Renewable Energy Target arrangements. An ACCU represents one tonne of carbon-dioxide-equivalent abatement under the ACCU Scheme. MWh and tCO₂-e are different units. You cannot substitute one for the other merely because both products are described as environmental.
In a synthetic procurement ledger, 90 eligible electricity certificates allocated to 120 MWh of consumption would cover 75% on a one-certificate-per-MWh arithmetic basis. This is not a completed reporting claim: confirm product eligibility, vintage, ownership, surrender or retirement, geographic and accounting boundaries, and whether another party has already used the attributes.
If the PPA seller retains or sells the certificates, buying the energy contract alone does not prove that the customer owns those attributes. Keep any emissions calculation separate, using the applicable accounting method rather than assuming a universal conversion from one LGC to one ACCU. A credible procurement recommendation records exactly what claim the evidence can support.
05REGO: a current scheme, not a synonym for LGC
As checked on 19 September 2026, CER describes REGO as a distinct renewable-electricity certification scheme within Guarantee of Origin. It can document renewable electricity generated or eligible storage dispatch. CER states that the same electricity generation cannot be used to create both an LGC and a REGO certificate, even if a facility participates in both schemes.
Treat the product definition and eligible use as a live verification task. Record the scheme, facility, relevant generation or dispatch period, ownership and certificate status. Do not assume that a familiar LGC process automatically satisfies the separate REGO requirements, or that a battery can create additional renewable attributes from unverified charging energy.
Granular attribute records can support more specific analysis, but an annual total still does not establish hourly matching. In the three-period exercise, coincident matching is min(40,60) + min(40,30) + min(40,0) = 70 MWh, or about 58.3% of load. The aggregate 75% and coincident 58.3% answer different questions; neither demonstrates an approved product claim without its governing framework.
06Bring a decision, not just a cheap strike price
Prepare a comparison of a pay-as-produced offer and a firmed alternative. Include scope, output shape, buyer load, settlement reference, negative-price treatment, certificate rights, term, indexation, credit support, delay provisions and exit rights. Document which assumptions are commercial choices and which need legal, engineering or accounting review.
Stress the last-period spot price from $200 to $300/MWh while keeping load and project output unchanged. Physical cost rises by 40 × $100 = $4,000 and the PPA receipt does not change because eligible output in that period is zero. Net cost rises to $19,300. This is a fixed-profile sensitivity, not a forecast or an optimised procurement strategy.
Recommend the next decision gate: obtain interval load data, reconcile eligible output and attribute ownership, and compare alternatives on total cost and residual risk. Use Topics 20 and 21 for exposure and cash-flow mechanics, Topic 36 for renewable capture value, Topic 42 for large-load needs and Topic 45 for the separate emissions-compliance boundary. The linked case exercise provides the same data for independent reconstruction.
Watch the explanation
Key terms in plain English
- LGC
- Large-scale generation certificate: an electricity attribute associated with one MWh of eligible renewable generation. Ownership and eligible use must be checked separately from an energy contract.
- ACCU
- Australian carbon credit unit: one tonne of CO₂-equivalent abatement under the ACCU Scheme. It is not a one-MWh renewable electricity certificate.
- REGO
- Renewable Electricity Guarantee of Origin: a distinct electricity certification scheme. Participation alongside the LGC scheme does not allow double creation from the same generation.
- MWh
- Megawatt-hour: a quantity of energy. A steady 1 MW for one hour delivers 1 MWh.
- PPA
- Power purchase agreement: a contract for electricity-related supply or settlement. Volume, price, environmental products and risk allocation depend on the contract.
Supporting diagrams
Three ledgers, three different promises
A renewable procurement decision must reconcile all three, not just the PPA strike.
- 01 · Physical supplyKeep the site supplied
Load, network connection, retail supply and backup arrangements
- 02 · Financial contractAllocate price + volume risk
Defined output, reference price, strike and settlement direction
- 03 · AttributesSubstantiate the claim
Eligible certificate, ownership, surrender or retirement and accounting boundary
The same total can hide a timing gap
Three synthetic one-hour periods. Load is 40 MWh in each; eligible PPA output changes.
- 01 · Period 160 MWh output
40 MWh load; 40 matched; 20 excess
- 02 · Period 230 MWh output
40 MWh load; 30 matched; 10 short
- 03 · Period 30 MWh output
40 MWh load; none matched; 40 short
- Aggregate quantity ratio
- 90 ÷ 120 = 75%
- Coincident match ratio
- 70 ÷ 120 ≈ 58.3%
- Final-period uncovered load
- 40 MWh