Teaching scenarioADDED OCT 2026

The hedge covers normal demand, not the heatwave

A retailer has a fixed-volume swap but customer load rises during an expensive afternoon. The trading desk must explain why a hedge did not prevent a loss.

Permanent case link

Your task

Reconcile physical purchases, swap receipts and retail contribution. Test additional hedge volume without treating it as risk-free protection.

PrepareThree-period margin bridge + over-hedge sensitivity + trading-limit recommendation
Your role

Retail portfolio analyst preparing a daily exposure note

Practice data & worked solution
PRACTICE DATASET

Volume risk behind a fixed-price sale

Download CSV

Original synthetic three-hour scenario at one price reference. Each interval lasts one hour. Retail receipts are A$130 per customer MWh. A 50 MW financial swap receives spot and pays A$80/MWh. Ignore premiums, losses, network charges, customer defaults, taxes and collateral. The calculated contribution is not company profit.

Teaching inputs · synthetic data
HourCustomer load MWSpot AUD per MWhSwap MWSwap strike AUD per MWh
140505080
2602005080
3805005080

Your analysis

  1. Calculate physical spot cost, swap receipts, net procurement cost and contribution after retail receipts.
  2. Increase swap volume to 70 MW throughout. Show the change in contribution and explain the remaining shape exposure.
  3. Keep the 70 MW swap but set all prices to A$30/MWh and all loads to 40 MW. Compare this result with a 50 MW swap and explain the over-hedge risk.
Worked solution

Base reconciliation

Physical purchases cost A$54,000. Swap receipts are −A$1,500, A$6,000 and A$21,000, totalling A$25,500. Net procurement cost is A$28,500. Retail receipts are 180 × 130 = A$23,400, so contribution is −A$5,100. The fixed hedge leaves 30 MWh exposed in the most expensive hour.

More volume, different exposure

A 70 MW swap receives A$35,700 in total. Net procurement cost falls to A$18,300 and contribution rises to A$5,100. Residual load minus hedge is −30, −10 and +10 MWh. The first two hours are over-hedged; this is not a fully shaped hedge.

Low-price transfer

Under the new load and prices, physical cost is A$3,600 and retail receipts A$15,600. The 70 MW swap pays A$10,500, giving net procurement A$14,100 and contribution A$1,500. A 50 MW swap pays A$7,500 and yields A$4,500 contribution. The extra hedge worsens this scenario by A$3,000. Set limits using multiple load-price scenarios, not one heatwave.

Review your response
  • Signs: swap receipts turn negative below strike.
  • Reconciliation: physical cost minus hedge receipts equals net procurement cost.
  • Risk: volume, shape and price-reference risk are distinguished.
  • Governance: the recommendation names forecast, credit and limit evidence still required.

This checklist supports self-review. No tutor marking or independent credential is included.

Related topics 4
Sources & evidence

All figures are original teaching inputs, not observations or published forecasts. The official source supplies industry context, not this dataset. Source link checked 17 October 2026. A real assessment also needs load forecasts, executed hedge confirmations, customer tariffs and collateral terms.